Cold Storage / Refrigerated Warehouse
Hero image is representative of project type. Actual project photos available upon request.
Project Scope
Refrigerated distribution facility with insulated metal panel system — structural framing, dock canopies, vestibule steel, and high-pile storage rack anchorage coordination.
Key Challenge
Rack anchorage coordination with structural floor slab design
Storage rack suppliers required specific anchor zones embedded in the post-tensioned slab — a late addition to the project scope. Tectonix coordinated the anchor layouts between the rack vendor, structural engineer, and concrete contractor, preventing schedule-impacting slab conflicts.
Deliverables
- Full structural shop package
- Dock canopy details
- Vestibule and entry framing
- Rack anchor coordination drawings
- IFC model for owner review
Project Imagery
Images shown are representative of this building type and structural scope. Project-specific photos available on request.
Project Details
- Building Type
- Cold Storage
- Location
- San Antonio, TX
- Structural Tonnage
- ~730 tons
- Delivery Timeline
- 9 weeks
- Software Used
- Tekla StructuresAutoCAD