Back to All ProjectsIndustrial

Industrial Distribution Center

Hero image is representative of project type. Actual project photos available upon request.

Phoenix, AZ Distribution / Warehouse 2023
~620 T
Structural Tonnage
650+
Drawing Sheets
8 weeks
Delivery
43
RFIs Closed

Project Scope

Full structural steel detailing for a tilt-up distribution facility — columns, primary rigid frames, secondary framing, mezzanine, and dock canopies.

Key Challenge

Complex mezzanine tie-in with precast tilt-up panels

Coordinating the steel mezzanine framing with an ongoing precast erection schedule required tight embed scheduling and real-time RFI management. Our U.S. PM held weekly standing calls with the GC to keep both trades synchronized.

Deliverables

  • Anchor bolt plans
  • Erection drawings
  • Shop drawings (650+ sheets)
  • 3D Tekla model (IFC export)
  • AISC connection design assist

Project Imagery

Images shown are representative of this building type and structural scope. Project-specific photos available on request.

Representative imagery — Distribution / Warehouse (1 of 2)
Representative
Representative imagery — Distribution / Warehouse (2 of 2)
Representative

Project Details

Building Type
Distribution / Warehouse
Location
Phoenix, AZ
Structural Tonnage
~620 tons
Delivery Timeline
8 weeks field-to-final
Software Used
Tekla StructuresAutoCAD

Tags

IndustrialWarehouseTeklaMezzanine