Back to All ProjectsCommercial / Medical
Medical Office Building
Hero image is representative of project type. Actual project photos available upon request.
Dallas, TX Healthcare / MOB 2023
~280 T
Structural Tonnage
3
Floors
11 weeks
Delivery
6
BIM Clash Sets
Project Scope
Three-story medical office building — moment frames, composite deck framing, canopy structures, and mechanical equipment support steel.
Key Challenge
Multi-trade BIM coordination for mechanical equipment steel
The MEP layout changed three times during detailing. Our model was kept current in Tekla and exported to the BIM coordination team's Revit environment after each revision, eliminating costly field clashes.
Deliverables
- Shop drawings
- Anchor bolt plans
- IFC / Navisworks clash model
- Mechanical support steel details
- Composite deck layout sheets
Project Imagery
Images shown are representative of this building type and structural scope. Project-specific photos available on request.
Representative
Project Details
- Building Type
- Healthcare / MOB
- Location
- Dallas, TX
- Structural Tonnage
- ~280 tons
- Delivery Timeline
- 11 weeks
- Software Used
- Tekla StructuresRevit BIM coordination
Tags
CommercialHealthcareBIMMoment Frame
Have a Similar Project?
Submit your drawings for a free review by a U.S. project manager.
Request a ReviewView All Projects