Language

Representative image — Educational / Gymnasium
Back to All ProjectsEducation

K–12 Gymnasium & Activity Center

Hero image is representative of project type. Actual project photos available upon request.

Tucson, AZ Educational / Gymnasium 2024
~195 T
Structural Tonnage
120 ft
Max Truss Span
7 weeks
Delivery
18
Camber Diagrams

Project Scope

Long-span gymnasium structure with long-span trusses, bleacher support framing, skylights, and connection into a new classroom addition.

Key Challenge

Long-span truss fabrication detailing with camber requirements

The 120-foot clear-span roof trusses required precise camber specifications coordinated with the structural engineer's deflection analysis. Tectonix produced detailed shop camber diagrams and confirmed allowable fabrication tolerances with the fabricator before issuing final drawings.

Deliverables

  • Long-span truss shop packages
  • Camber diagrams
  • Bleacher support steel
  • Skylight framing details
  • Classroom addition tie-in details

Project Imagery

Images shown are representative of this building type and structural scope. Project-specific photos available on request.

Representative imagery — Educational / Gymnasium (1 of 1)
Representative

Project Details

Building Type
Educational / Gymnasium
Location
Tucson, AZ
Structural Tonnage
~195 tons
Delivery Timeline
7 weeks
Software Used
Tekla Structures

Tags

EducationLong-SpanTrussCamber

Have a Similar Project?

Submit your drawings for a free review by a U.S. project manager.

Request a ReviewView All Projects