K–12 Gymnasium & Activity Center
Hero image is representative of project type. Actual project photos available upon request.
Project Scope
Long-span gymnasium structure with long-span trusses, bleacher support framing, skylights, and connection into a new classroom addition.
Key Challenge
Long-span truss fabrication detailing with camber requirements
The 120-foot clear-span roof trusses required precise camber specifications coordinated with the structural engineer's deflection analysis. Tectonix produced detailed shop camber diagrams and confirmed allowable fabrication tolerances with the fabricator before issuing final drawings.
Deliverables
- Long-span truss shop packages
- Camber diagrams
- Bleacher support steel
- Skylight framing details
- Classroom addition tie-in details
Project Imagery
Images shown are representative of this building type and structural scope. Project-specific photos available on request.
Project Details
- Building Type
- Educational / Gymnasium
- Location
- Tucson, AZ
- Structural Tonnage
- ~195 tons
- Delivery Timeline
- 7 weeks
- Software Used
- Tekla Structures
Tags
Have a Similar Project?
Submit your drawings for a free review by a U.S. project manager.
Request a ReviewView All Projects