Flexible Delivery Options
Not every project should be delivered the same way. Our standard hybrid model pairs U.S. project management with two-shift global production — drawings advance while you sleep. For government, military, and security-restricted work, we execute the entire package inside our U.S. office. Either way, you get the same PM, the same QA/QC gate, and the same drawing standards.
What's Included
Inside a Delivery Models Scope
Hybrid two-shift production, U.S.-only execution for restricted projects, and scalable capacity — pick the delivery model that fits your project's security and schedule requirements.
Hybrid Two-Shift Model
U.S. project management with overnight global production. Questions asked at 4 PM are answered by drawings in your inbox at 7 AM.
U.S.-Only Execution
For government, military, ITAR, and security-restricted projects, the entire detailing package is produced exclusively within our Mesa, Arizona office.
Scalable Capacity
Team size flexes with your backlog — surge capacity for megaprojects, right-sized teams for steady work, without you carrying the overhead.
Phased & Sequenced Release
Drawing packages structured by phase, area, or erection sequence to match your fabrication schedule and shop loading.
Overflow & Rescue Work
Taking over stalled packages from another detailer, or absorbing overflow when your in-house team is at capacity.
Cross-Time-Zone Continuity
Production never depends on a single office or a single person. Project knowledge lives in the model, the logs, and your U.S. PM.
Deliverables
Deliverable Format Matrix
Exactly what lands in your inbox, in what format, and what your shop uses it for.
| Deliverable | Format | Used For |
|---|---|---|
| Delivery model recommendation | Written scope review | Matching model to security and schedule needs |
| Standard drawing packages | PDF, DWG, CNC | Identical output regardless of delivery model |
| U.S.-only compliance statement | Documentation for restricted-project requirements | |
| Phased release schedule | XLS, PDF | Sequencing drawings to fabrication phases |
| Capacity plan | Written proposal | Surge staffing on large or fast projects |
| Takeover assessment | Written scope review | Rescuing stalled or troubled packages |
Typical Project Timeline
How a Delivery Models Engagement Runs
Durations vary with project size and document completeness — we confirm a project-specific schedule during your free scope review.
Model Selection
We recommend hybrid or U.S.-only delivery based on your project's security requirements, schedule, and budget — documented in the proposal.
Team Assembly
Production team sized and assigned under your U.S. PM; for restricted work, U.S.-office staffing is confirmed in writing.
Production
Two-shift or U.S.-only production runs against the agreed release schedule, with weekly capacity reviews as scope evolves.
Scale Events
Added phases, acceleration requests, or scope growth absorbed by flexing the team — without resetting the schedule.
Where This Service Matters Most
Relevant Industries
Flexible Delivery Options shows up on every project type, but these are the sectors where it carries the most weight.
Need Flexible Delivery Options on Your Next Project?
Send us your plans and specs. A U.S. project manager will review your scope and respond within 24–48 business hours — at no cost.