Miscellaneous Metals

Miscellaneous metals often demand more coordination per ton than heavy structural steel. Stair stringers must land on embeds placed months earlier. Handrails must meet code dimensions after finishes are applied. Tectonix details misc steel with the architectural coordination and code awareness it actually requires — never as an afterthought bolted onto a structural package.

What's Included

Inside a Misc Metals Scope

Stairs, handrails, ladders, grating, embeds, and secondary steel detailed to the same standard as primary structure — because misc is where field problems hide.

Stairs & Stringers

Straight, switchback, and monumental stairs detailed with tread, riser, and landing dimensions verified against code and architectural finishes.

Handrails & Guardrails

Pipe and tube rail systems detailed to IBC/OSHA dimensional requirements, with post spacing and mounting details coordinated to structure.

Ladders & Cages

Fixed ladders, ship ladders, and safety cage systems detailed to OSHA standards with roof access and fall-protection coordination.

Grating & Checkered Plate

Grating layouts with banding, cutouts, and clip details — coordinated around penetrations, equipment, and drainage.

Embeds & Anchors

Embed plates, ledger angles, and cast-in anchors detailed and scheduled for the concrete contractor before pours — the details that prevent field welding later.

Mezzanines, Canopies & Supports

Equipment platforms, mechanical supports, canopies, bollards, lintels, and the long tail of secondary steel every project carries.

Deliverables

Deliverable Format Matrix

Exactly what lands in your inbox, in what format, and what your shop uses it for.

DeliverableFormatUsed For
Misc steel shop drawingsPDF, DWGFabrication of stairs, rails, ladders, and grating
Erection / placement drawingsPDF, DWGField installation and embed placement
Embed schedules & layoutsPDF, DWGConcrete contractor coordination before pours
CNC / DSTV filesNC1, DXFPlate processing and automated cutting
Bill of materialXLS, CSV, KISSMaterial procurement and shop tracking
Tekla 3D modelNative .db1, IFCCoordination with structural and architectural models

Typical Project Timeline

How a Misc Metals Engagement Runs

Durations vary with project size and document completeness — we confirm a project-specific schedule during your free scope review.

1
2–3 days

Scope Review & Kickoff

Free scope review covering the full misc package — including items buried in architectural sheets that structural-only reviews miss.

2
1–2 weeks

Embed & Early-Release Items

Embeds, anchors, and ledger angles detailed first so the concrete schedule is never waiting on steel details.

3
2–5 weeks

Stairs, Rails & Main Package

Stair and rail systems modeled against architectural dimensions, drawings extracted, QA-checked, and released by area or priority.

4
Ongoing

Field Coordination & Revisions

As-built dimension changes and finish coordination handled through the revision log, with your U.S. PM flagging code-dimension impacts.