Project Management & Quality Control
Detailing capacity means nothing without control. Every Tectonix project is run by a U.S.-based project manager who answers your calls in your time zone, attends your coordination meetings, and owns the revision log. Behind them, every drawing passes a 100% internal QA/QC check against the contract documents before it leaves our office. This is the system that lets fabricators trust high-volume production.
What's Included
Inside a PM & QC Scope
A dedicated U.S.-based project manager and a 100% internal QA/QC check on every drawing — the management layer that keeps our 40+ person team aligned and your project under control.
Dedicated U.S. Project Manager
A single point of contact in Mesa, Arizona — same time zone, direct phone line, and real accountability for your schedule.
100% Internal QA/QC
Every drawing checked against contract documents by a second set of eyes before submittal. Not spot checks — every sheet, every revision.
RFI Management
RFIs drafted, tracked, and batched into revision sets. Your PM assesses schedule impact and flags critical-path items before they bite.
Live Revision & Drawing Logs
A current drawing status log on every project, so your shop always knows what is released, what is in revision, and what is on hold.
Submittal Cycle Control
Approval packages assembled, tracked through review, and comments incorporated on a documented cycle — no lost markups, no version confusion.
Coordination Meeting Attendance
Your PM joins BIM coordination, OAC, and fabrication planning calls — the detailer is in the room, not three time zones away.
Deliverables
Deliverable Format Matrix
Exactly what lands in your inbox, in what format, and what your shop uses it for.
| Deliverable | Format | Used For |
|---|---|---|
| Drawing status log | XLS, PDF, live share | Shop visibility into release and revision status |
| RFI log & drafts | PDF, XLS | EOR/GC communication and impact tracking |
| Revision packages | PDF, DWG | Controlled incorporation of design changes |
| QA/QC checklists | Documented verification on every submittal | |
| Schedule updates | PDF, XLS | Weekly progress and look-ahead reporting |
| Submittal transmittals | Documented submittal-cycle records |
Typical Project Timeline
How a PM & QC Engagement Runs
Durations vary with project size and document completeness — we confirm a project-specific schedule during your free scope review.
Kickoff & Communication Plan
PM assigned, contact protocols set, drawing log initialized, and schedule baseline agreed with your team.
Production Oversight
Daily production monitoring, weekly status reports, and immediate escalation when document conflicts or scope gaps surface.
QA/QC Gate
Each drawing package passes the full internal check against contract documents before it is transmitted — no exceptions.
Close-Out
Final as-detailed records, complete revision history, and model handover documented and delivered.
Where This Service Matters Most
Relevant Industries
Project Management & Quality Control shows up on every project type, but these are the sectors where it carries the most weight.
Need Project Management & Quality Control on Your Next Project?
Send us your plans and specs. A U.S. project manager will review your scope and respond within 24–48 business hours — at no cost.