Project Management & Quality Control

Detailing capacity means nothing without control. Every Tectonix project is run by a U.S.-based project manager who answers your calls in your time zone, attends your coordination meetings, and owns the revision log. Behind them, every drawing passes a 100% internal QA/QC check against the contract documents before it leaves our office. This is the system that lets fabricators trust high-volume production.

What's Included

Inside a PM & QC Scope

A dedicated U.S.-based project manager and a 100% internal QA/QC check on every drawing — the management layer that keeps our 40+ person team aligned and your project under control.

Dedicated U.S. Project Manager

A single point of contact in Mesa, Arizona — same time zone, direct phone line, and real accountability for your schedule.

100% Internal QA/QC

Every drawing checked against contract documents by a second set of eyes before submittal. Not spot checks — every sheet, every revision.

RFI Management

RFIs drafted, tracked, and batched into revision sets. Your PM assesses schedule impact and flags critical-path items before they bite.

Live Revision & Drawing Logs

A current drawing status log on every project, so your shop always knows what is released, what is in revision, and what is on hold.

Submittal Cycle Control

Approval packages assembled, tracked through review, and comments incorporated on a documented cycle — no lost markups, no version confusion.

Coordination Meeting Attendance

Your PM joins BIM coordination, OAC, and fabrication planning calls — the detailer is in the room, not three time zones away.

Deliverables

Deliverable Format Matrix

Exactly what lands in your inbox, in what format, and what your shop uses it for.

DeliverableFormatUsed For
Drawing status logXLS, PDF, live shareShop visibility into release and revision status
RFI log & draftsPDF, XLSEOR/GC communication and impact tracking
Revision packagesPDF, DWGControlled incorporation of design changes
QA/QC checklistsPDFDocumented verification on every submittal
Schedule updatesPDF, XLSWeekly progress and look-ahead reporting
Submittal transmittalsPDFDocumented submittal-cycle records

Typical Project Timeline

How a PM & QC Engagement Runs

Durations vary with project size and document completeness — we confirm a project-specific schedule during your free scope review.

1
Day 1

Kickoff & Communication Plan

PM assigned, contact protocols set, drawing log initialized, and schedule baseline agreed with your team.

2
Continuous

Production Oversight

Daily production monitoring, weekly status reports, and immediate escalation when document conflicts or scope gaps surface.

3
Before every release

QA/QC Gate

Each drawing package passes the full internal check against contract documents before it is transmitted — no exceptions.

4
Project end

Close-Out

Final as-detailed records, complete revision history, and model handover documented and delivered.

Need Project Management & Quality Control on Your Next Project?

Send us your plans and specs. A U.S. project manager will review your scope and respond within 24–48 business hours — at no cost.

Free scope review in 24–48 hoursprojects@tectonixsteel.com