What Should Be Included in a Steel Detailing RFQ?

An incomplete RFQ produces an incomplete proposal. When a detailing firm quotes without understanding the full scope, deliverables, and schedule, the price you see is not the price you will pay. A complete RFQ eliminates that gap. Here is exactly what to include.

Project Documents to Attach

Every steel detailing RFQ should include the most current structural drawings (IFC if available, design-development if not), the project specifications Division 05, and any addenda issued to date. Architectural floor plans help the detailer understand cope and clearance requirements. Include a full drawing index even if some drawings are not yet issued — it tells the detailer what to expect.

  • Structural drawings — current revision, IFC preferred
  • Project specifications — Division 05, Division 01 general requirements
  • Architectural floor plans and reflected ceiling plans
  • Full drawing index with revision status
  • Geotechnical report if base plates or embeds are in scope

Scope and Deliverable Requirements

Clearly state what is in scope and what is not: structural steel only, or miscellaneous steel included; connection design delegated or EOR-designed; BIM model required or not; CNC files required; specific software platform preferred. A vague scope produces a wide proposal range that cannot be compared apples-to-apples.

  • Structural steel tonnage (approximate)
  • Miscellaneous steel included or excluded
  • Connection design responsibility
  • Required deliverables: shop drawings, erection drawings, BOM, CNC files, IFC model
  • Preferred detailing software platform

Schedule and Communication Requirements

Include the fabrication start date, required steel-on-site date, and any phasing requirements. If the project requires weekly coordination meetings, morning progress reports, or specific submittal formats, state that in the RFQ. Detailing firms price their time — a project requiring 10 coordination meetings per month costs more to manage than one requiring a monthly summary.

  • Fabrication start date and steel-on-site date
  • Priority sequences and first-release requirements
  • Submittal format requirements (transmittals, revision numbering)
  • Meeting cadence and attendance requirements
  • Revision and change-order allowance expectations
steel detailing RFQdetailing proposalscope of workdeliverablesfabrication