Tectonix offers hybrid delivery and U.S.-only execution options for qualifying projects. The delivery approach is reviewed against project scope and security requirements, then confirmed with the customer before work begins.

What's Included

Inside a Delivery Models Scope

Hybrid two-shift production, U.S.-only execution for restricted projects, and scalable capacity — pick the delivery model that fits your project's security and schedule requirements.

Hybrid Two-Shift Model

U.S. project management with overnight global production. Questions asked at 4 PM are answered by drawings in your inbox at 7 AM.

U.S.-Only Execution

For government, military, ITAR, and security-restricted projects, the entire detailing package is produced exclusively within our Mesa, Arizona office.

Scalable Capacity

Team size flexes with your backlog — surge capacity for megaprojects, right-sized teams for steady work, without you carrying the overhead.

Phased & Sequenced Release

Drawing packages structured by phase, area, or erection sequence to match your fabrication schedule and shop loading.

Overflow & Rescue Work

Taking over stalled packages from another detailer, or absorbing overflow when your in-house team is at capacity.

Cross-Time-Zone Continuity

Production never depends on a single office or a single person. Project knowledge lives in the model, the logs, and your U.S. PM.

Deliverables

Deliverable Format Matrix

Exactly what lands in your inbox, in what format, and what your shop uses it for.

DeliverableFormatUsed For
Delivery model recommendationWritten scope reviewMatching model to security and schedule needs
Standard drawing packagesPDF, DWG, CNCIdentical output regardless of delivery model
U.S.-only compliance statementPDFDocumentation for restricted-project requirements
Phased release scheduleXLS, PDFSequencing drawings to fabrication phases
Capacity planWritten proposalSurge staffing on large or fast projects
Takeover assessmentWritten scope reviewRescuing stalled or troubled packages

Typical Project Timeline

How a Delivery Models Engagement Runs

Durations vary with project size and document completeness — we confirm a project-specific schedule during your free scope review.

1
During scope review

Model Selection

We recommend hybrid or U.S.-only delivery based on your project's security requirements, schedule, and budget — documented in the proposal.

2
3–5 days

Team Assembly

Production team sized and assigned under your U.S. PM; for restricted work, U.S.-office staffing is confirmed in writing.

3
Project duration

Production

Two-shift or U.S.-only production runs against the agreed release schedule, with weekly capacity reviews as scope evolves.

4
As needed

Scale Events

Added phases, acceleration requests, or scope growth absorbed by flexing the team — without resetting the schedule.

Need Flexible Delivery Options on Your Next Project?

Send us your plans and specs. A U.S. project manager will review your scope and respond within 24–48 business hours — at no cost.

Free scope review in 24–48 hoursprojects@tectonixsteel.com